Time:2026-08-09 Browse: 102

Before conducting the water flow test, inspect the waterproof and drainage facilities in the test environment to ensure no water accumulation or debris in the test area. Set up and fix the test device and core components such as guide rails, adjust the water flow parameters to the set values, monitor the ambient temperature, humidity and water flow stability throughout the process. Clean the site in a timely manner and store the equipment after the test.
Copyright @ 2026 Shenzhen Jiajia Eye Technology Co., Ltd.